Methodology
Sentinel Power Cube
In four steps, without stopping operations: discovery, transparent reporting, zero-downtime plan, delivery. The output of every step in your hands, and the right to walk away at every step.
Four steps
Step 01 · Discovery
Hover the layers, drag to rotate
Why this order
Most projects start with product selection and discover the need afterwards. We do the opposite: first we measure the current state, then define the target, and the product comes last. This order prevents both unnecessary license purchases and downtime during the transition.
- Every step closes with a written output
- The right not to continue at the end of a step
- The outage window is committed up front
- No cutover starts without a rollback plan
Free IT Health Check
See your infrastructure through a sentinel’s eyes.
Current state assessment, risk inventory and a prioritized roadmap. No commitment.