Sentinel Information Technologies

Professional Services · Installation

The team that designs it installs it, documents it and hands it over

Virtualization, storage, network, security and Citrix installations; configuration by best practice, testing, documentation and go-live. The outage window is committed up front.

  • Scope

    Servers · Network · Security

  • Delivery

    Documented

  • Warranty

    30 days of hypercare

The difference between “it works” and “installed correctly” shows at the first failure

Sentinel installations follow vendor best practices and CIS baselines; every installation passes a test plan and is delivered with an operations manual. During the 30 days of hypercare after go-live, the same team stays with you.

  • Built to standards

    Vendor reference architectures and security baselines; no shortcuts.

  • Documented delivery

    Architecture diagram, configuration dump, operations manual and rollback plan.

  • Planned downtime

    Outage window and duration in the contract; with a pilot and rollback plan.

Installation areas

Installation projects we do frequently

  • Virtualization

    VMware vSphere, Hyper-V, Nutanix clusters

  • Storage

    SAN/NAS, vSAN, S3 object storage

  • Network

    Core switches, wireless, SD-WAN

  • Security

    FortiGate, NetScaler, EDR, e-mail security

  • Citrix

    CVAD, NetScaler, StoreFront, FAS

  • Microsoft

    Active Directory, Exchange, SQL Server, M365

  • Backup

    Veeam Backup & Replication, immutable repository

  • Data center

    Rack layout, cabling, cross-connect

Process

From design to go-live

Installation flow

Design

Architecture and test plan

Approval

Design document

Installation and testing

Configuration, validation

Acceptance test

Together

Go-live

Documentation, training, hypercare

No production cutover without a rollback plan.

Sentinel Power Cube · Step 4: Delivery

Packages

By project size

  • Single component

    Standard

    Single product installation (e.g. FortiGate, Veeam)

    Fixed price

    Project based

    • Design summary
    • Installation and testing
    • Configuration dump
    • 30 days of hypercare
    Request a quote
  • Most popular

    Multiple components

    Infrastructure Project

    Virtualization, storage, network and security together

    By scope

    Project based

    • Detailed architecture document
    • Pilot and wave plan
    • Operations manual and training
    • Project manager
    Request a quote
  • Turnkey

    Data Center

    New data center or relocation

    By scope

    Project based

    • Rack, power and cabling plan
    • Installation of all layers
    • Relocation and cutover management
    • DR site integration
    Request a quote

Frequently asked questions

The most common questions about installation services

  • Yes. Installation is done regardless of where hardware and licenses come from; if you wish we provide technical specification support for procurement.

  • Not for a new installation; when replacing an existing system an outage window is planned and written into the contract. Most cutovers complete with under an hour of downtime.

  • Architecture diagram, IP and VLAN plan, configuration dump, admin account list (passwords in a secure vault), operations manual and rollback plan.

  • Priority support from the installing team for 30 days after go-live; fine-tuning and small fixes are free during this period.

  • Optionally under a managed services contract; the team that did the installation continues with operations.

Free IT Health Check

See your infrastructure through a sentinel’s eyes.

Current state assessment, risk inventory and a prioritized roadmap. No commitment.

Cookie preferences

We use cookies that are necessary for the site to work. Measurement and analytics cookies are enabled only with your consent. See our cookie policy for details. Cookie policy