Sentinel Information Technologies

Professional Services · Migration

On migration day, nobody should notice

Microsoft 365 tenant migration, data center moves, Hyper-V and VMware transitions, on-premises to cloud: with a pilot, wave plan and rollback plan, a method that cuts downtime to minutes.

  • Method

    Replication based

  • Typical downtime

    < 1 hour

  • Rollback plan

    Every wave

A badly planned migration is the new system’s first bad impression

Sentinel migration projects start with discovery and a dependency map; systems are split into waves and each wave is validated with a pilot. Data is moved in advance by replication; on cutover night only the delta and DNS change happen. A rollback plan is ready for every wave.

  • Dependency map

    Which application depends on which server and service; nobody says “we forgot that server”.

  • Zero-downtime method

    Replication with Veeam, Azure Migrate and vendor tools; only the final delta on cutover night.

  • Rollback guarantee

    A tested rollback for every wave; if something goes wrong you return to the old system.

Migration types

Migration projects we run frequently

  • Microsoft 365 tenant

    Mail, OneDrive, SharePoint and Teams migration and merging

  • Exchange to M365

    Hybrid or cutover migration, MX plan

  • Data center move

    Physical relocation or move to Sentinel Cloud

  • Hyper-V ↔ VMware

    Virtualization platform change

  • On-premises to cloud

    Moving workloads to Sentinel Cloud or Azure

  • Storage migration

    SAN/NAS replacement, data migration

  • Active Directory

    Forest/domain consolidation and upgrades

  • File server

    Migration to Sentinel Drive or SharePoint

Process

From discovery to post-migration care

Migration flow

Discovery and plan

Dependencies, waves, rollback

Approval

Wave plan

Replication and pilot

Data moved in advance

Acceptance

Pilot validation

Cutover and hypercare

Final delta, DNS, 30 days of support

The cutover-night runbook is written minute by minute; every step has a rollback point.

Veeam · Azure Migrate · Vendor tools

Packages

By migration type

  • Tenant and mail

    M365 Migration

    Moving mail and collaboration data

    Per user

    Project based

    • Identity and MX plan
    • Staged or cutover migration
    • User communication
    • 30 days of hypercare
    Request a quote
  • Most popular

    Servers and platform

    Infrastructure Migration

    Virtualization, data center or cloud transition

    Per server

    Project based

    • Dependency map
    • Replication-based migration
    • Wave and rollback plan
    • Project manager
    Request a quote
  • Turnkey

    Full Relocation

    Data center, identity and applications together

    By scope

    Project based

    • Plan for all layers
    • Weekend cutover operation
    • DR site setup
    • Post-migration optimization
    Request a quote

Frequently asked questions

The most common questions about migration

  • In the replication-based method only the final delta and redirection happen on cutover night; under an hour for most systems. The duration is written per system in the wave plan.

  • It is kept in parallel for at least 30 days after cutover; it is shut down with your approval at the end of hypercare.

  • The vendor support policy is reviewed and, if necessary, the plan is made together with the vendor. In unsupported scenarios the risk is reported in writing.

  • In M365 migrations usually nothing; if a profile update is required, a step-by-step guide and service desk are provided.

  • It depends on vendor license terms; transferability and SPLA/CSP alternatives for Windows Server, SQL and Citrix licenses are evaluated during planning.

Free IT Health Check

See your infrastructure through a sentinel’s eyes.

Current state assessment, risk inventory and a prioritized roadmap. No commitment.

Cookie preferences

We use cookies that are necessary for the site to work. Measurement and analytics cookies are enabled only with your consent. See our cookie policy for details. Cookie policy